Onslow Beach Bridge Construction
230316-M-PK533-4008.JPG Photo By: Cpl. Jennifer E. Reyes

Sep 25, 2023
MCB CAMP LEJEUNE, N.C. - Five 124-foot girders are in place allowing for the removal of the temporary work platform on the island side of the Atlantic Intracoastal Waterway at Onslow Beach on Marine Corps Base Camp Lejeune, North Carolina, March 8, 2023. Due to damage from Hurricane Florence, the 70-year-old swing bridge at Onslow Beach is being replaced by a single leaf Bascule bridge (levered vertical platform) with a projected completion date in the spring of 2025. The bridge replacement is part of the overall Task Force Florence hurricane reconstruction project. (U.S. Marine Corps photo by Cpl. Jennifer E. Douds)


DOWNLOAD PHOTO (9.72 MB)


This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at http://www.dimoc.mil/resources/limitations.html , which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.



Back to Gallery